Intermittent connectivity
Minor incident
Brown Muir Mast
Salterhill Relay
East Mains Relay
Miltonhill Relay
Kellas Relay
Sunnyside Relay
Cul Mor Relay
Ark Childcare Relay
Newton Relay
Glen of Rothes Relay
Lochnabo
Conasg Relay
2025-09-26 22:40 BST
· 18 hours, 33 minutes
Updates
Resolved
September 27, 2025 · 17:13 BST
Engineers have replaced the power supply to the switch and all equipment voltages are now stable.
Issue
September 26, 2025 · 22:40 BST
We are aware of an issue affecting customers off our Brown Muir mast site. Engineers have identified a voltage issue on the switch powering a number of radios at the site which is causing them to reboot at random intervals.
We have scheduled an engineer visit tomorrow to investigate further and replace any failing power equipment.