Mast maintenance from 2019-09-22 13:00 BST to 2019-09-22 18:00 BST
Scheduled maintenance
Brown Muir Mast
Mulben Mast
Balnellan Mast
2019-09-22 13:00 BST
· 5 hours
Updates
Scheduled
November 4, 2021 · 15:24 BST
There will be a period of downtime this afternoon between 1pm and 6pm affecting Mulben and Balnellan masts as well as some services on our Brown Muir mast. This is to allow for essential maintenance to our cabling.
We anticipate that the downtime should last no more than 30 minutes during this window.
← Back