Network Upgrades - Brown Muir Mast from 2019-09-26 13:49 BST to 2019-09-28 12:00 BST
Scheduled maintenance
Brown Muir Mast
Kellas Relay
Sunnyside Relay
Cul Mor Relay
Ark Childcare Relay
Newton Relay
Mulben Mast
Invercanna Relay
Knockans Relay
Garland Farm Relay
Stoneyton Relay
Maryhill Relay
Coldhome Relay
Aulton Farm Relay
Balnellan Mast
Lochliesk Farm Relay
Duffus Mast
2019-09-26 13:49 BST
· 1 day, 22 hours, 10 minutes
Updates
Scheduled
November 4, 2021 · 15:24 BST
We will be undertaking maintenance and upgrades at our Brown Muir mast on Saturday 26th September between 0500 and 0800.
During this time we will be replacing the core switch on the mast as well as completing upgrades to the network and electrical cabling on site. This will necessitate some downtimes during the maintenance window although these will be kept as short as possible.
These upgrades are designed to deal with the network performance issues we have been noticing lately and have the ultimate aim of improving service for all users.
← Back